In September 2021, Chengde Wanze Energy Technology Co., Ltd. undertook the State Grid poverty alleviation project
Installed 10KW wind power generation project in Fuxingdihou Banner, Weichang County, Chengde City
This project was led by the State Grid Corporation of China and constructed and installed by Wanze Energy. It took one month to complete the installation and commissioning and was successfully connected to the grid.
Generates 18,000 yuan of income per year for 5 poor households, with each household increasing its income by 3,600 yuan per year
2021-9-20
Chengde Wanze Energy Technology Co., Ltd.