Dual-Axis Solar Sunflowers | Case Study in Jiangsu, China
2025-12-02
Project Timeline: September 2023
Project Location: Jiangsu, China
Project Scale: 2 Dual-Axis SolarFlowers
Technical Features: GPS-enabled sun-tracking system, synchronous dual-axis rotation
In September 2023, we initiated a strategic partnership with Changjian Construction Group to support the completion of their new, state-of-the-art green-energy industrial complex.
As part of this collaboration, their team sought a detailed consultation on our automatic solar panel tracking system the "Solar Sunflower" , to understand its potential for integration into their project.

Our objective was to provide renewable energy solution that would significantly contribute to the facility's long-term carbon footprint reduction.
Following productive discussions, an agreement was reached to install two Solar Sunflower units at the project's entrance, complementing a multi-spot solar carport structure planned for the parking area.

The installation was completed efficiently within a two-week period, concluding on September 20, 2023, ahead of the main factory's commissioning.
This early completion allowed the system to immediately power on-site construction infrastructure and lighting.
Upon the facility's operational launch, the solar units were integrated into the permanent energy grid, providing clean, sustainable power.